The soil work space room is to be take by the HDPE breadth of the high strength, was become by strong dint welding of have the net space room structure, it flex from such as, the conveyance can fold, usage the hour opens and hurtles to fill the ground, or concrete to anticipate, constituting to have the strong side to limit and greatly just the structure body of the degree. Can use to be the mat layer, handle the loading ability that the weak foundation enlarges the foundation, also can build to constitute the ÆÂ to face the protection structure on the bedcover, can also use to construct to pay file structure etc. Technical Data Art No. | Width(cm) | Length (cm) | Height (mm) | Welding Interval (mm) | Thickness (mm) | Unit Weight (g/m2) | Peeling Strength at Welding Point ( N/ mm) | Peeling Strength at Connecting ( N/ mm) | Slice Yield Strength ( N/ mpa) | PLC0301 | 600 | 400 | 50 | 400 | 1 | 550 | 10 | 10 | 18 | PLC0302 | 600 | 400 | 75 | 400 | 1 | 850 | 10 | 10 | 18 | PLC0303 | 600 | 400 | 100 | 400 | 1 | 1100 | 10 | 10 | 18 | PLC0304 | 600 | 400 | 150 | 400 | 1 | 1600 | 10 | 10 | 18 | PLC0305 | 600 | 400 | 200 | 400 | 1 | 2200 | 10 | 10 | 18 | Remarks: A breadth of product can press customer to request to create at will, other special specification according to agreement or contract performance. | |